Automation level: Routine factory tests are divided into high-voltage and low-voltage test areas. The low-voltage test area generally uses a mobile test vehicle for testing, and the computer automatically completes the testing process; the high-voltage test area is for conducting no-load tests, induction withstand voltage, and power frequency withstand voltage one-time wiring, and the computer automatically completes the testing process.
Testing efficiency: The common configuration is 2 low-pressure workstations and 2 high-pressure workstations. Two testers can easily complete the testing of 20 products in one day for 8 hours. If this efficiency is achieved in the traditional testing mode, at least 4 people are needed, and the work intensity is high.
Advantages: Easy to operate, no need for professional technicians, and can start work after simple training;
We can use the existing vehicles for transfer.
All test items are tested by the host computer software, which can realize the paperless operation of the test station.